Cart (0)
  • No items in cart.
Total
$0
There is a technical issue about last added item. You can click "Report to us" button to let us know and we resolve the issue and return back to you or you can continue without last item via click to continue button.
Search book title
Filters:
BOOKS
PACKAGES
EDITION
to
PUBLISHER
(1)
(353)
(651)
(599)
(58)
(290)
(1042)
(728)
(2262)
(117)
(97896)
(58)
(635)
(132)
(33)
(28)
(20)
(99791)
(18)
(1)
(396)
(328)
(10763)
(7369)
(252)
(21)
(24378)
(849)
(7)
(1723)
(23)
(19)
(28)
(4)
 
(6)
(7)
(128)
(1)
(3)
(58)
(5)
(5)
(1)
(1)
(2)
(28)
(27)
(36)
(13)
(71)
(24)
(25)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(34)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Product - Data Sheet
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Sustainability
 Technical Bulletin
 All
  • ISO
    ISO 16530-1:2017 Petroleum and natural gas industries - Well integrity - Part 1: Life cycle governance
    Edition: 2017
    $629.86
    / user per year

Content Description

ISO 16530-1:2017 is applicable to all wells that are operated by the petroleum and natural gas industry. This document is applicable to any well, or group of wells, regardless of their age, location (including onshore, subsea and offshore wells) or type (e.g. naturally flowing, artificial lift, injection wells).

ISO 16530-1:2017 is intended to assist the petroleum and natural gas industry to effectively manage well integrity during the well life cycle by providing:

- minimum requirements to ensure management of well integrity; and

- recommendations and techniques that well operators can apply in a scalable manner based on a well's specific risk characteristics.

Assuring well integrity comprises two main building blocks: the first is to ensure well integrity during well design and construction, and the second is to manage well integrity throughout the remaining well life thereafter.

This document addresses each stage of the well life cycle, as defined by the six phases in a) to f), and describes the deliverables between each phase within a Well Integrity Management system.

a) The "Basis of Design Phase" identifies the probable safety and environmental exposure to surface and subsurface hazards and risks that can be encountered during the well life cycle. Once identified, these hazards and risks are assessed such that control methods of design and operation can be developed in subsequent phases of the well life cycle.

b) The "Design Phase" identifies the controls that are to be incorporated into the well design, such that appropriate barriers can be established to manage the identified safety and environmental hazards. The design addresses the expected, or forecasted, changes during the well life cycle and ensures that the required barriers in the well's design are based on risk exposure to people and the environment.

c) The "Construction Phase" defines the required or recommended elements to be constructed (including rework/repair) and verification tasks to be performed in order to achieve the intended design. It addresses any variations from the design which require a revalidation against the identified hazards and risks.

d) The "Operational Phase" defines the requirements or recommendations and methods for managing well integrity during operation.

e) The "Intervention Phase" (including work-over) defines the minimum requirements or recommendations for assessing well barriers prior to, and after, any well intervention that involves breaking the established well barrier containment system.

f) The "Abandonment Phase" defines the requirements or recommendations for permanently abandoning a well.

The six phases of the well life cycle, as defined in this Scope, and their interrelationships, are illustrated in Figure 1 in the Introduction.

ISO 16530-1:2017 is not applicable to well control. Well control refers to activities implemented to prevent or mitigate unintentional release of formation fluids from the well to its surroundings during drilling, completion, intervention and well abandonment operations, and involves dynamic elements, i.e. BOPs, mud pumps, mud systems, etc.

ISO 16530-1:2017 is not applicable to wellbore integrity, sometimes referred to as "borehole stability". Wellbore integrity is the capacity of the drilled open hole to maintain its shape and remain intact after having been drilled.



About ISO

ISO, the International Organization for Standardization, brings global experts together to agree on the best way of doing things – for anything from making a product to managing a process. As one of the oldest non-governmental international organizations, ISO has enabled trade and cooperation between people and companies all over the world since 1946. The International Standards published by ISO serve to make lives easier, safer and better.

X